AgileEPC

Mandatory for systems over 12 kW.

Air conditioning inspections (TM44)

Air conditioning systems with a combined effective rated output above 12 kW must be inspected by an accredited energy assessor at least every five years. We carry out TM44 inspections, lodge the report and give you practical recommendations to cut running costs.

From £295 inc. VAT
A92+B81-91C69-80NextD55-68NowE39-54F21-38G1-20CurrentPotential

Who needs it

  • Office, retail and hospitality landlords
  • Facilities and property managers
  • Data centres and server rooms
  • Schools, surgeries and public buildings
  • Any business with several split or VRF units adding up to over 12 kW

What is included

  • Inspection by an accredited air conditioning energy assessor
  • Review of system sizing, controls and maintenance
  • TM44 report lodged on the register
  • Recommendations to improve efficiency
  • Help identifying all units that count towards the 12 kW threshold

How it works

  1. Tell us about the property

    Use the quote form or send a property list. We confirm a fixed price.

  2. Book a visit

    We schedule an accredited assessor at a time that suits you or your tenant.

  3. On-site survey

    The assessor surveys the building and records photographic evidence.

  4. Certificate lodged

    Your certificate is lodged on the official register and emailed to you.

Frequently asked questions

How do I know if my system is over 12 kW?

Add up the cooling output of every air conditioning unit in the building controlled by the same person. If the total is above 12 kW, an inspection is required.

How often is a TM44 inspection needed?

At least every five years.

Is there a penalty?

Yes. Failing to have a valid inspection report can lead to a penalty, and the report must be handed to any new owner or occupier responsible for the system.

Need a certificate?

Tell us about the property and we will come back with a fixed price, usually the same working day.

Get a fixed-price quote